250th Anniversary of Freedom

from $33.00

250th Anniversary of American Freedom — custom laser-cut design (Carbon steel or Stainless steel)

Celebrate 1776–2026 with a precision laser-cut commemorative piece from Metallum Designs. We’ll create a durable, beautiful steel design of the “250th Anniversary of American Freedom” tailored to your specifications — perfect for public displays, historical societies, veteran organizations, parks, memorials, or private collectors.

Options

  • Materials: Carbon steel (prime for powder coat or rusted/aged finish), Stainless steel (low-maintenance, polished or brushed finish).

  • Mounting & hardware: countersunk holes, welded tabs, mounting brackets, standoffs, or integrated base plates. Anchor inserts or bolt kits available for outdoor installations.

  • Detailing: fine cut lettering and numerals, pierced stars and stripes.

Production & timeline

  • Proofing: digital mockup and material/finish samples provided for approval.

  • Typical lead times: small orders 5–10 business days after approval; medium 10–20 business days; large or multi-piece projects 3–6 weeks depending on complexity and finish work.

  • Rush options available for expedited projects.

Material:

250th Anniversary of American Freedom — custom laser-cut design (Carbon steel or Stainless steel)

Celebrate 1776–2026 with a precision laser-cut commemorative piece from Metallum Designs. We’ll create a durable, beautiful steel design of the “250th Anniversary of American Freedom” tailored to your specifications — perfect for public displays, historical societies, veteran organizations, parks, memorials, or private collectors.

Options

  • Materials: Carbon steel (prime for powder coat or rusted/aged finish), Stainless steel (low-maintenance, polished or brushed finish).

  • Mounting & hardware: countersunk holes, welded tabs, mounting brackets, standoffs, or integrated base plates. Anchor inserts or bolt kits available for outdoor installations.

  • Detailing: fine cut lettering and numerals, pierced stars and stripes.

Production & timeline

  • Proofing: digital mockup and material/finish samples provided for approval.

  • Typical lead times: small orders 5–10 business days after approval; medium 10–20 business days; large or multi-piece projects 3–6 weeks depending on complexity and finish work.

  • Rush options available for expedited projects.